New Products Flash Sale
Thread Tools
This thread is privately moderated by Odysis, who may elect to delete unwanted replies.
Old Apr 01, 2008, 05:19 AM
Odysis is offline
Find More Posts by Odysis
Life begins at transition
Discussion

Berkut


Progress as at 01 Apr 08
Last weekend quite slow, due working.

Achieved:
Paneled gear/fan/intake sections. Now panelled from B1 to fan rear. Fwd fuse stiff as a board!
Fan mounted properly; B8 cut out.
Wing and canard cut out.
All bulkheads installed on stb side.

To come:
Panel 4 rear sections
Build intake / exhaust cones
Cut out intake/exhaust from bulkheads

Random thoughts:
Intake: 3/4-3mm-3/4? Blue foam plug, slice'n'reglue?
Power upgrade path. 7s and new escs, or new fans?

Pics attached.
Sign up now
to remove ads between posts
Old Apr 01, 2008, 06:05 AM
EDFjet is offline
Find More Posts by EDFjet
Closed Account
Looking even better now man. She is taking shape. Looking forward to seeing the ducting
Old Apr 01, 2008, 07:26 PM
airpower is offline
Find More Posts by airpower
Have fun
airpower's Avatar
will you also use the canards for control also???
Old Apr 02, 2008, 01:13 AM
Odysis is offline
Find More Posts by Odysis
Life begins at transition
Quote:
Originally Posted by airpower
will you also use the canards for control also???
Yup, they'll be mixed for pitch. I'm tossing up a few ideas as to how, i.e. use them for vortex control or as a lifting control surface, but that'll come out in the flight testing. My pusher berkut used to use them as a lifting surface, and it flew quite well (torque roll excluded)

Thread Tools