RT Models MIG-15 EDF build, 38" wingspan. started the construction last weekend here are some pics of the progress so far.
Sign up now
to remove ads between posts
Feb 01, 2007, 08:16 PM
Eject! Eject! Eject!
AeroDude's Avatar
more pics, these pic's show the detail of the tail construction. I decided to install the elevator servo into the vertical tail.

AD
Feb 01, 2007, 10:43 PM
Registered User
Looks great I'll have to stay tuned...
Feb 02, 2007, 12:13 AM
Suspended Account
kriptonic's Avatar
I have an RT models shorts kit....... maybe this will motivate me to start building.

Gene
Feb 02, 2007, 06:10 PM
Eject! Eject! Eject!
AeroDude's Avatar
Servo's installed into the wings, rib caps installed, getting ready to construct the fuselage, pictures to follow.

Kriptonic, get started, you can catch up!

AD
Feb 02, 2007, 07:30 PM
Registered User
GAANDAHL's Avatar
Thanks for starting the thread. I've got a short kit too. I won't be making it soon, but I'm really looking forward to it.
George
Feb 03, 2007, 12:53 PM
Eject! Eject! Eject!
AeroDude's Avatar

Fuselage


here are the pics from the lower half of the fuselage construction, formers are set in place and then planked with 1/16 balsa, the top half will be constructed in the same manner. I plan on glassing the entire fuse with 3/4 oz glass and polycrylic.

AD
Feb 03, 2007, 08:31 PM
Eject! Eject! Eject!
AeroDude's Avatar
Installed the Wimotec mini 480 EDF with HET Typhoon EDF-2W 450 Watt motor, 4750 KV. here are pics of the EDF installed into the bottom of the fuse, next comes the inlet and exhaut ducts.

AD
Feb 04, 2007, 11:38 AM
Eject! Eject! Eject!
AeroDude's Avatar

more pic's


a couple more pics with inlet duct and first section of exhaust duct installed, I decided to install the top half of the formers with additional braces between the top and bottom halves, and plank once everything is in place. The plans say to build the top and bottom halves seperate then join them with epoxy.

the saga continues
Feb 04, 2007, 08:35 PM
Eject! Eject! Eject!
AeroDude's Avatar

finished duct


a couple pic's of the completed duct, next step will be to complete the planking on the top of the fuse, sand and fiberglass the fuse with 3/4 oz glass and polycrylic.

AD
Feb 07, 2007, 08:19 PM
Eject! Eject! Eject!
AeroDude's Avatar

update


more pic's of my progress, did a dry fit test to ensure everything fits properly before finishing the fuse. the other pics show the finished fuselage. nest step is to sand and glass the fuse..

AD
Feb 08, 2007, 08:08 PM
Eject! Eject! Eject!
AeroDude's Avatar
fuselage fully glassed, vertical tail installed, next step to install wings prior to covering, current weight is 19 oz.

AD
Feb 08, 2007, 10:33 PM
Suspended Account
kriptonic's Avatar
where is the battery hatch?

Gene
Feb 09, 2007, 07:58 PM
Eject! Eject! Eject!
AeroDude's Avatar
More pic's,

Kriptonic these pic's show the bays for the ESC, RX and battery.

more to follow..........

more sanding, glass the LE of the wings for strength and durability, apply covering and paint..

AD
Feb 11, 2007, 08:04 PM
Eject! Eject! Eject!
AeroDude's Avatar
More done, more pic's, finished the canopy, working on the bay door...

AD


Thread Tools

Similar Threads
Category Thread Thread Starter Forum Replies Last Post
F/S RT Models Mig 15 with extras DnB Aircraft - Electric - Airplanes (FS/W) 0 Dec 11, 2003 11:36 PM
Newbie to EDF - RT Models Mig 15 dneisler Electric Ducted Fan Jet Talk 5 Mar 12, 2003 04:46 PM
RT Models Mig-15 E-power ARC Mark Turner Aircraft - Electric - Airplanes (FS/W) 0 Feb 21, 2003 03:31 PM
Any experirnce with RT Models Mig 15? totalboss Electric Ducted Fan Jet Talk 1 May 12, 2002 10:57 AM
RT Models Mig-15 Jim Phelps Electric Ducted Fan Jet Talk 8 Feb 07, 2002 04:08 PM