|
|
|
Lee Ulinger Designed Yak-55 Build thread
I pick up a Lee Ulinger Designed Foamtana at the Arizona Electric Festival a few months back and to say it’s a great flying plane is an understatement. Word has it that his Yak55 flies as good as the Foamtana so I picked one up. This plane is about the same size as the Foamtana and should weigh about the same.
Lee Ulinger Designed Yak-55 Wing Span: 39in Wing Area: 394sq. in. Length: 39in Weight: 16oz Available at: http://www.darrolcady.com Equipment to be used: Servos: 4 Hitec HS-56 Motor: Hacker A20-22L Outrunner Controller: Hacker X-20 Battery: ThunderPower 3S-1320 Propeller: 10x3.8 APC-Slow The plane arrived well packaged in a single small box with the peaces bagged and taped to the inside of the box. |
|
|
|
|
|
|
Laying out all the peaces, everything is very strait with clean cut lines.
|
|
|
|
|
|
The Assembly starts with gluing the carbon rods into the wing and elevator. I used 30 minute epoxy by poring it into the slot and then pressing the rod in place.
|
|
|
|
|
|
Wipe away any excess glue then cover with plan protector and weight down until dry.
|
|
|
|
|
|
The fuse construction starts by gluing on the cross brace. The braces slide into cuts in the fuse making alignment simple. Just use a triangle to check everything is at 90 degrees and run a bead of foam safe CA down both sides. You also add the rear tri stock at this point.
|
|
|
|
|
|
For the opposite side you need to hang the fuse off the side of your work table and repeat the above step.
|
|
|
|
|
|
With the cross braces in place glue the motor mount and weight down until dry.
|
|
|
|
|
|
Then sand motor mount supports to fit behind the mount and glue in place.
|
|
|
|
|
|
Time to finish the wing by taping the ailerons on. Make sure you tape the top and the bottom. I use the recommended Blenderm medical tape.
|
|
|
|
|
|
The last step for the wing is to glue the wing centerpiece in place. There is a mark to help line things up just right.
|
|
|
|
|
|
Finished wing ready to be glued to the fuse.
|
|
|
|
|
|
Slide the wing in place and check alignment. When you are happy with the placement run a bead of foam safe CA around all connecting seems.
|
|
|
|
|
|
After hinging the elevator onto the stab the same way as the ailerons slide the stab into position an check alignment. When satisfied glue in place with foam safe CA.
|
|
|
|
|
|
With the stab in place tape the Rudder on.
|
|
|
|
|
|
The last step before installing your radio gear is gluing in the control arms. Cut a slit into the ailerons so that the control arms hole will be directly over the hinge line.
|
|
|
Thread Tools | |
Similar Threads | |||||
Category | Thread | Thread Starter | Forum | Replies | Last Post |
Build Log | Hyperion Yak 55 25e Build,tips, And Flying Thread | hemituda | 3D Flying | 214 | Jun 19, 2018 11:33 PM |
Great Planes Yak 55 Build Thread | ToyRunner | 3D Flying | 90 | Jul 10, 2010 07:12 AM | |
Discussion | Aeroworks 100cc Yak QB Build thread... | Joe__Hunt | Fuel Plane Talk | 8 | Dec 24, 2006 10:13 PM |
Insane Foamies Full Fuse Yak-54 build and fly thread! | j_z_123 | 3D Flying | 52 | Aug 20, 2005 09:48 PM | |
Twin Vasa 55 Typhoon.....Build thread | Robert May | Electric Ducted Fan Jet Talk | 27 | May 04, 2005 05:40 AM |