Top sheeted the centre section, with 3/32 sheet, its more than 4" wide so takes 2 sheets and they need to be 48" sheets, I know now!
The servo holders or at least the trays are in place as is the wiring along with a 4 pin socket for connecting when putting the wing on.
The end ribs have been bevelled to 5 degrees and the joiners are being glued in. This is out of proper order and would be easier to do in the correct order, ie when the wing is just a spar and ribs.