Comments (0)
Add Comment
-
Views: 24
That's an enormous amount of 12K high modules tow and M3 shrink tube. I'm waiting for a delivery of PVA. -
Views: 29
That's a test part to see where I'm at with the program. -
Views: 42
Finished test part, That's 1 1/4 dia. the finished part will be 1 1/2 dia. I'm waiting for a 3/32 ball mill for the o-ring. -
Views: 2
-
Views: 1
-
Views: 107
All monted in Addictions that I'm building for friends. -
Views: 89
All done 90 grams each. -
Views: 95
Removing and installing new shafts. -
Views: 86
24 pole Racestar 4108 600Kv quad motors with short shafts. -
Views: 88
M-42 tool steel motor shafts. No flat spots just a drill point for the set screw to index.
-
Views: 140
Big motor in a small space. -
Views: 137
Machined centering jig bolted to the motor, Motor mount bolted to the motor. -
Views: 130
New motor mount glued, Notice the offset. The designer offset the center of the motor to the pod. You almost got me. -
Views: 130
Aeronaut spinner with APC 7X4 all power coming from 800 Mah 6s battery.
-
Views: 415
Ground the original motor mount out and machined a new one. There is no way I'm going to run the motor wires through drilled holes on the outside of the fuselage. -
Views: 440
Alignment tool bolted to the motor and the motor bolted to the new mount while the epoxy is drying. -
Views: 399
New motor mount. -
Views: 454
Motor installed with the motor wires hanging free. -
Views: 414
And on to the next problem. The light weight E-flight yoke is to narrow for the blades to fold back.