Doom 3D's blog View Details
Archive for January, 2017
Posted by Doom 3D | Jan 19, 2017 @ 09:44 AM | 4,622 Views
After the main install of the turbine and exhaust pipe. The built was straight forward. I upgraded the AIL and EleV servos with the flaps and rudder servos will be upgraded too in the near future. Installed all the fuel system, electrical, and radio systems.
Posted by Doom 3D | Jan 19, 2017 @ 07:45 AM | 4,637 Views
Getting there, designed motor mounts that could use the built in edf mounts.
Posted by Doom 3D | Jan 19, 2017 @ 12:35 AM | 4,629 Views
My newest completed build. Has been test flown and it performed great. Will post pics next time I go fly it. I was torn between building one small jet with either a wren 44 or a k45, or building a big jet like 80n+. I decided to build small p20 and medium size k60. Here is the small project. Pictures show project from start to finish. Took about 2 weeks of custom building on the airframe of the stinger 90. Most time went into building engine mount and cutting of foam and wood parts to allow install of components without jeapordizing the structural strength. My goal was to have smoke on board this jet orginally. But decided the system was to heavy for the performance I was looking to attain. Ill be saving the smoke for the new HSD Superviper when I get around to buying it All the bells and whistles! Installed telementry, backup flight battery, tamjets UAT and antistatic tubing, and went abit over board with the receiver but as insurance, the P20SX isnt cheap!...Continue Reading