Archive for November, 2015
Comments (2)
Add Comment
-
Views: 148
Centering rings and stringers -
Views: 186
Foam outer structure dry assembled. -
Views: 142
nose unit, base plate, carbon rod and nose -
Views: 171
Nose unit with 29mm tube installed to hold nose weight if needed and to suppor the stringers for the nose sheeting. -
Views: 167
Nose structure and lower nose structure waiting for sheeting. -
Views: 168
Lexan fins dry fit into centering rings with guide slots. You can also see the block to attach the rail guide. -
Views: 133
Forward transition and parachute bay installed. -
Views: 158
Nose and fuse sheeting installed