May 23, 2004, 02:44 PM
|
|
|
Albuquerque NM
Joined Oct 2003
8,222 Posts
|
Filling the gaps
Using 30 minute epoxy and micro ballons means you really have about 10 minutes working time  So, have everything at the ready when you mix up the glue. I loaded the slurry into a syringe and shot a bead of glue all the way around the 1/4 sq support rails, pressed the deck in place and clamped it in. Then, a second batch of "hoopy goopy" was mixed up, a little thicker than the first, and shot into the gap around the edge. To level everything up, dip a bodo squeegy, cut down to about a 1" width, into denatured alcohol and pull the excess material out of the corner, all the way around. Use an alcohol wetted towel to clean up the residue before things get too sticky. If any gaps or air bubbles open up, go back and add more epoxy mix as needed. Then, let it dry overnight, and remove the clamps. Finally, sand the edges to remove any remaining epoxy residue.
The bulwarks will go in next, so stay tuned for the phots as they come.
PAT
|
|
|
|
|