Build Blog P11

Long Lay off, work starts again tomorrow at 08.00. Have to install HT steel beams to replace existing wall structure to give us access through to the extended portion of the building.
Once those are in place the brickwork can be removed, the new internal dividing walls constructed, electrical wiring installed, walls can be plastered and the new heating system installed then the floor can be screeded and the new timber flooring laid, kitchen installed, new fence and driveway made and Bob's your uncle.
Completion mid march I hope and we'll have a big spring barbeque to set things off!
I have a feeling that the fence and drive may be delayed but not the barbeque!!!!!
Braddock, VC is offline Find More Posts by Braddock, VC
RCG Plus Member
Latest blog entry: Reverse Takeover
Reply With Quote
Sign up now
to remove ads between posts
Reply

Thread Tools

Similar Threads
Category Thread Thread Starter Forum Replies Last Post
Build Log Updating Jet Ranger to OH-58 Building Blog catcat Scale Helicopters 23 Jul 29, 2013 02:20 AM
Discussion Hawker Sea Fury Building Blog catcat Fuel Warbirds 19 Feb 07, 2013 04:49 PM
Discussion Cybird P11 electronics rkhsaw Ornithopters 0 Oct 30, 2006 07:24 AM