HobbyKing.com New Products Flash Sale
Reply
Thread Tools
Old Jan 13, 2010, 07:36 AM
Registered User
P. Tritle's Avatar
Albuquerque NM
Joined Oct 2003
8,502 Posts
Mini-Review
Building the St. Lawrence River Skiff from M.A.C.K. Products

Had the oppertunity to review the M.A.C.K. Products St. Lawrence River Skiff, so thought I'd post it up here as well.

The kit is excellant, primarily of bass wood construction. Plans and Instructions are good, and the laser cutting is first class. Overall, this is a really nice kit. So, lets get started.
P. Tritle is offline Find More Posts by P. Tritle
Reply With Quote
Sign up now
to remove ads between posts
Old Jan 13, 2010, 07:39 AM
Registered User
P. Tritle's Avatar
Albuquerque NM
Joined Oct 2003
8,502 Posts
Setting Up the Hull Framing Jig

The hull is cold molded over the laser cut framing jig supplied with the kit. The jig is assembled and tack glued to the building board, and is where the hull planks will be shaped and glued in place in the keel assembly.

The keel assembly is then built up and tacked to the jig. From there, the planks are glued in place one at a time, starting at the keel.
P. Tritle is offline Find More Posts by P. Tritle
Reply With Quote
Old Jan 13, 2010, 07:54 AM
Registered User
P. Tritle's Avatar
Albuquerque NM
Joined Oct 2003
8,502 Posts
Fitting the Planks

The laser cut planks are fitted one at a time, working from side to side to keep the loads symmetrical until all the planks are in place. There are 7 planks per side.

Generally speaking, the planks fit really well. There was a bit off pulling and tugging involved, but none needed trimming to fit. Then once the planks were in place, the hull was removed from the jig and the final gluing done to join the planks down the length of the hull. The stem and stearn caps were added and the hull sanded to final shape. A coat of thinned West Systems epoxy brushed on to seal the wood.
P. Tritle is offline Find More Posts by P. Tritle
Reply With Quote
Old Jan 13, 2010, 08:00 AM
Registered User
P. Tritle's Avatar
Albuquerque NM
Joined Oct 2003
8,502 Posts
Adding the Hull Ribs

Once cured, the jig formers were taped back into the hull to hold its shape while the ribs are fitted and glued in place. Spacers are used to mark the location of each rib.
P. Tritle is offline Find More Posts by P. Tritle
Reply With Quote
Old Jan 13, 2010, 08:11 AM
Registered User
P. Tritle's Avatar
Albuquerque NM
Joined Oct 2003
8,502 Posts
Gluing the Ribs in Place

The ribs are added one at a time working toward both ends from center center. As the process progresses, the next former in line was removed untill all the frames had been removed.
P. Tritle is offline Find More Posts by P. Tritle
Reply With Quote
Old Jan 13, 2010, 08:32 AM
Registered User
P. Tritle's Avatar
Albuquerque NM
Joined Oct 2003
8,502 Posts
Finishing Up the Ribs

After all the frames were removed the ribs were added all the way out to both ends.

To aid in forming the wetted bass wood strips for the ribs a piece of 1" dowel was used to form the basic shape, then once glued in the ends were trimmed with a fingernail clipper. Once it was all finished and sanded, 2 coats of spar varnish were brushed on the inside of the hull.
P. Tritle is offline Find More Posts by P. Tritle
Reply With Quote
Old Jan 13, 2010, 08:48 AM
Registered User
P. Tritle's Avatar
Albuquerque NM
Joined Oct 2003
8,502 Posts
Fitting the Floorboards

With all the ribs in place, the hull was now completely rigid, and much easier to work with then before when it had a real mushy feel about it. The laser cut floor boards were fitted and glued in place. Again, the fit was near perfect, with no trimming required. Then once the floor boards were in, the speaders were added at both ends and the deck added.
P. Tritle is offline Find More Posts by P. Tritle
Reply With Quote
Old Jan 13, 2010, 08:53 AM
Registered User
P. Tritle's Avatar
Albuquerque NM
Joined Oct 2003
8,502 Posts
Fitting the Deck

The deck was glued in place next. The parts are cut a bit oversize, so there's plenty of room for alignment. Once the parts are aligned and glued in place the edges were trimmed and sanded into the edge of the top plank.
P. Tritle is offline Find More Posts by P. Tritle
Reply With Quote
Old Jan 13, 2010, 09:08 AM
Registered User
P. Tritle's Avatar
Albuquerque NM
Joined Oct 2003
8,502 Posts
Adding the Cockpit Combing

The cockpit combing was added next. The front and rear sections were wetted and preformed around the wood dowl, then glued in place. The mid sections were then added.

Then the rub rails were fitted and glued in place, sealed with thin Cya, and the belt line between the rails was painted blck. Planned to leave the planks natural, so wanted a little color for contrast.
P. Tritle is offline Find More Posts by P. Tritle
Reply With Quote
Old Jan 13, 2010, 09:30 AM
Registered User
P. Tritle's Avatar
Albuquerque NM
Joined Oct 2003
8,502 Posts
Fitting the Seats

The seats were trimmed to fit, then the seperation lines scribed into the boards with a home made tool. The wood was then stained and two coats of varnish applied.
P. Tritle is offline Find More Posts by P. Tritle
Reply With Quote
Old Jan 13, 2010, 09:47 AM
WooHoo!
woodybob's Avatar
Lake Balboa, CA
Joined Jun 2007
5,118 Posts
Very nice, you make this look like an afternoon build.
Cool model.
woodybob is offline Find More Posts by woodybob
Reply With Quote
Old Jan 13, 2010, 09:52 AM
Registered User
P. Tritle's Avatar
Albuquerque NM
Joined Oct 2003
8,502 Posts
Woodybob, Oh no, been working on this one for several weeks. It's a great kit, but is also a challenging build.

PAT
P. Tritle is offline Find More Posts by P. Tritle
Reply With Quote
Old Jan 13, 2010, 10:31 AM
Registered User
P. Tritle's Avatar
Albuquerque NM
Joined Oct 2003
8,502 Posts
Building the Oar Locks

The oar lock pins were fitted into a cutting jig and cut to length, then removed from the jig and glued into the laser cut plywood brackets.
P. Tritle is offline Find More Posts by P. Tritle
Reply With Quote
Old Jan 13, 2010, 10:39 AM
Registered User
P. Tritle's Avatar
Albuquerque NM
Joined Oct 2003
8,502 Posts
Finishing the Inside

Got the last of the interior details in and painted. From here, it's on to the oars.
P. Tritle is offline Find More Posts by P. Tritle
Reply With Quote
Old Jan 13, 2010, 10:54 AM
Damp and Dizzy member
Brooks's Avatar
Bozeman, Montana, United States
Joined Aug 2003
3,410 Posts
Beautiful, thanks for the thread!
Brooks is online now Find More Posts by Brooks
Reply With Quote
Reply


Thread Tools

Similar Threads
Category Thread Thread Starter Forum Replies Last Post
Alert M.A.C.K. PRODUCTS raises PRICES on MIDWEST R/C MODELS frankg Scale Boats 2 Nov 04, 2009 07:37 AM
New Product Legend Model Boats, new kit release "ST. LAWRENCE River Skiff frankg Scale Boats 14 Sep 09, 2009 11:52 AM
Mini-Review Jersey Speed Skiff from M. A.C.K. Products P. Tritle Scale Boats 66 Aug 26, 2009 07:21 AM
Alert Notice To Customers Ordering Imex Model Boats From M.A.C.K. Products frankg Scale Boats 3 Aug 06, 2008 06:55 PM
Discussion M.A.C.K. products 2400 motor empirebuilder Dock Talk 2 Jul 16, 2006 09:50 AM