Thread: Build Log Yardbird!!!!!
View Single Post
Old Dec 20, 2006, 12:48 AM
schrederman is online now
Find More Posts by schrederman
Hot Dawg Glider Pilot
schrederman's Avatar
United States, TX, Weatherford
Joined Nov 2002
8,010 Posts
Double D...

Double Ds!!! Well, OK, doubled D-tube... The bottom cf cap was laid down when the sheet was laid out. After the ribs were done, I did all the shear webs at the same time, because it's tedious... The front webs are added with thin CA, and it will run around and glue the cf to the sheeting... and to you as it travels up the grain of the wood... Make absolutely certain that the webs are straight, and don't protrude over the rib tops. Use a straight edge to check, and an emory board to take them down if necessary. The cap is added with slow CA... and when all else is done...
schrederman is online now Find More Posts by schrederman
Reply With Quote