Thread: Build Log Flyguy 62 Version 2
View Single Post
Old Feb 21, 2013, 06:23 PM
Otto Dieffenbach is offline
Find More Posts by Otto Dieffenbach
United States, CA, San Diego
Joined Aug 2011
2,889 Posts
Step 20

Attach the ESC to the motor, check rotation with a battery/receiver and locate the ESC as far forward as possible. I attach it to the side of the head with double sided foam tape and wrap with a zip tie. I also put a zip tie around the motor wiring at the head's rear edge to hold the wiring in place. My last two Flyguy 62 builds have not required ballast; so if you can mirror my positions of electronics, you may get lucky too.

Note the cutout at front of head for a FPV key chain camera. Cutout is shown temporaily glued in place until shakedown flights are complete.
Otto Dieffenbach is offline Find More Posts by Otto Dieffenbach
Last edited by Otto Dieffenbach; Feb 22, 2013 at 01:13 AM.
Reply With Quote