Thread: Build Log Plank 1mp
View Single Post
Old Feb 01, 2013, 09:08 AM
Jon Snow is offline
Find More Posts by Jon Snow
You know nothing....
Jon Snow's Avatar
Joined Sep 2011
3,626 Posts
Straws for the servo wires set in,wax paper templates drawn.
The next job is sheeting the wing.Lower surface first on one half.I've left an overhang(underhang?)at the trailing edge.This will be mitred back to follow the contour of the top surface,and the top sheeting will lay on top.Some fill repairs needed on the edge.
Set up for a dry run.I've run some clear tape along the bed edges where there's a chance of the epoxy squeezing out
Jon Snow is offline Find More Posts by Jon Snow
Reply With Quote