Thread: Discussion Club Twistaholic
View Single Post
Old Jan 31, 2013, 03:51 PM
snowman is online now
Find More Posts by snowman
Registered User
United States, MI, Houghton
Joined Jan 2005
6,333 Posts
Quote:
Originally Posted by Waldopepperaxe View Post
Now I have to walk up from the basement, through the house, out the door down the 4 steps, across a sidewalk, through the garage, and then into the van and If I bring 4 or 5 planes that is about 6-10 trips like that with all the gear and planes needed. sometimes it takes me about 35 -40 minutes to load and the same to unload. great exercise though including the corn walks of shame lol but I have to admit its nice having a heated basement I can access from Inside for building projects in the winter
If I could get my car into my crumbling garage I could load directly from the workshop, but the garage has to have a new roof and car door one of these years first!

Oh, and Waldo, CONGRATULATIONS on quitting smoking........how's that going for ya? When you mentioned how long it takes to load your vehicle.......I remembered that you had said that you'd be quitting soon.....and that was awhile back.....
snowman is online now Find More Posts by snowman
Reply With Quote