View Single Post
Old Dec 03, 2012, 02:18 PM
ultimatetwo is offline
Find More Posts by ultimatetwo
Fly to live- Live to fly
ultimatetwo's Avatar
ROTA-CADIZ-SPAIN
Joined Jan 2008
1,246 Posts
Letīs continue with the airframe build... After we cut the optional rounds holes on the elevators to save some weigh, now it is the time for sanding... so replace all those old sand papers and get some time to do a good job. As said, the best covering jobs begin with a fine sanding...
Also we traced a pattern of the leading edge of the airfoil to help carve the Chilean pine and reach a accurate curve...
ultimatetwo is offline Find More Posts by ultimatetwo
Reply With Quote