Thread: Build Log Neos
View Single Post
Old May 08, 2012, 09:44 AM
ThomasLee is offline
Find More Posts by ThomasLee
Team Hong Kong F3K
ThomasLee's Avatar
Hong Kong
Joined Sep 2010
3,740 Posts
Starting work on my 3 Neos's that I'll fly with this summer... going 3-in-pod for all 3 of them so that I can easily swap wings to try new layups and ideas
Progress will be slower than usual for my build because of work and (more) work, so don't hold your breath!
Though if you bug me about it, I will probably get it done quicker...

Running 3* Jr385's in each fuselage, with a switchjack, 1s 750mah lipo, and RG631B receiver. Linkages will be mostly internal, and stick out of the fuse right before the connection with the flaperons - much easier to install, take on&off, and as Graham pointed out in the other thread, it is/should be in the dirty air from the fuse/wing connection anyway to notice any extra drag compared to internal ala Flow5.
ThomasLee is offline Find More Posts by ThomasLee
RCG Plus Member
Latest blog entry: Vibe Assembly Instructions
Reply With Quote