View Single Post
Old Apr 28, 2011, 11:44 PM
atesus is offline
Find More Posts by atesus
Registered User
atesus's Avatar
Los Gatos, CA
Joined Aug 2009
192 Posts
Once dry, I sanded the laminated E2 assembly down to 4mm and joined the elevator parts together.

I sanded the edges of the stab top/bottom reinforcement pieces to smoothly transition down to the stab surface. I lined up the holes using the clevis studs borrowed from the hardware bag and glued the plywood parts in place, completing the stab/elevator assembly.
atesus is offline Find More Posts by atesus
Reply With Quote