Thread: Build Log HMS Beagle 1:36
View Single Post
Old Apr 21, 2011, 09:17 AM
Jpop Andrew is offline
Find More Posts by Jpop Andrew
Registered User
Jpop Andrew's Avatar
United States, IN, Indianapolis
Joined Nov 2010
257 Posts
Holy cow this is a lot to figure out all at once. Looks like you need to have things pretty much planned out before you even begin.

So I need to drill holes in the deck around the masts and insert thin brass tubes for the rigging to move through, and let those stick up a bit so water on the deck won't just flood in. Then I install brass screw eyes into the bottom of the hull to direct the rigging to the servo points. Then I install brass screw eyes on the masts to direct the rigging over to the next mast's spars. And at some point in each rigging line I use an adjustable connection point to control any slack that creeps in.

Then I figure out some kind of single bar hinge or hanging hook to secure the spars to the masts.

Looks like a long walk through of Lowes coming up. Anymore advice?
Jpop Andrew is offline Find More Posts by Jpop Andrew