View Single Post
Old Feb 13, 2011, 04:08 PM
frankg is online now
Find More Posts by frankg
Registered User
Joined Dec 2004
4,175 Posts
The dashboard frame work is the next to be assembled on frame #6 using the laser etched out lines for locations of the of the 1/.8 x 1/4 basswood bottom frame flush with the bottom of frame #6. The glue in the 4 pieces of the 1/4 x 1/4 balsa material are measured, cut, and glued with medium CA glue from the basswood bottom frame to the top of radius of the frame. (see drawing #2) Note: the picture of the dashboard frame work was taken later in the build of the prototype model.

At this point in the build would be a good time to assemble the boat stand provided in the kit. This will protect the hull from any dings and staring of the mahogany before and after finishing. Use the boat stand assembly drawing for assembly. (DWG#3)

frankg is online now Find More Posts by frankg
Last edited by frankg; Feb 14, 2011 at 04:47 PM.
Reply With Quote