View Single Post
Old Jul 11, 2010, 10:56 AM
frankg is online now
Find More Posts by frankg
Registered User
Joined Dec 2004
4,173 Posts
The last part of the back deck inlay is glued in position on the bridge deck in front of the engine hatch using the 12 minute epoxy glue. The back edge (cut end) will be flush with the face of the frame opening (#F5).



frankg is online now Find More Posts by frankg
Reply With Quote