Thread: Discussion Micro3DX
View Single Post
Old Oct 27, 2008, 11:56 PM
jkarpy is offline
Find More Posts by jkarpy
jkarpy's Avatar
USA, FL, Orlando
Joined Aug 2006
2,027 Posts
Tail Section

Vertical and Horizontal Stab Assembly

Fig 38: Protect the plan (see Full Page Picture on Page 13) with transparent packing tape. Layout the parts and butt glue them with medium CA. Sand top and bottom flush after the glue has dried.
Fig 39: Bevel the leading edge of the elevator 45 degrees on the bottom side only.

Fig 40: Bevel the leading edge of the rudder 45 degrees on one side only.
jkarpy is offline Find More Posts by jkarpy
RCG Plus Member
Last edited by jkarpy; Dec 09, 2008 at 08:40 PM.
Reply With Quote