RC Groups

RC Groups
    Electric Ducted Fan Jet Talk
        Discussion RT Models MIG-15 Build

#1 AeroDude Feb 01, 2007 08:11 PM

RT Models MIG-15 Build
 
6 Attachment(s)
RT Models MIG-15 EDF build, 38" wingspan. started the construction last weekend here are some pics of the progress so far.

#2 AeroDude Feb 01, 2007 08:16 PM

5 Attachment(s)
more pics, these pic's show the detail of the tail construction. I decided to install the elevator servo into the vertical tail.

AD

#3 mediq Feb 01, 2007 10:43 PM

Looks great I'll have to stay tuned...

#4 kriptonic Feb 02, 2007 12:13 AM

I have an RT models shorts kit....... maybe this will motivate me to start building.

Gene

#5 AeroDude Feb 02, 2007 06:10 PM

Servo's installed into the wings, rib caps installed, getting ready to construct the fuselage, pictures to follow.

Kriptonic, get started, you can catch up!

AD

#6 GAANDAHL Feb 02, 2007 07:30 PM

Thanks for starting the thread. I've got a short kit too. I won't be making it soon, but I'm really looking forward to it.
George

#7 AeroDude Feb 03, 2007 12:53 PM

Fuselage
 
4 Attachment(s)
here are the pics from the lower half of the fuselage construction, formers are set in place and then planked with 1/16 balsa, the top half will be constructed in the same manner. I plan on glassing the entire fuse with 3/4 oz glass and polycrylic.

AD

#8 AeroDude Feb 03, 2007 08:31 PM

2 Attachment(s)
Installed the Wimotec mini 480 EDF with HET Typhoon EDF-2W 450 Watt motor, 4750 KV. here are pics of the EDF installed into the bottom of the fuse, next comes the inlet and exhaut ducts.

AD

#9 AeroDude Feb 04, 2007 11:38 AM

more pic's
 
2 Attachment(s)
a couple more pics with inlet duct and first section of exhaust duct installed, I decided to install the top half of the formers with additional braces between the top and bottom halves, and plank once everything is in place. The plans say to build the top and bottom halves seperate then join them with epoxy.

the saga continues

#10 AeroDude Feb 04, 2007 08:35 PM

finished duct
 
2 Attachment(s)
a couple pic's of the completed duct, next step will be to complete the planking on the top of the fuse, sand and fiberglass the fuse with 3/4 oz glass and polycrylic.

AD

#11 AeroDude Feb 07, 2007 08:19 PM

update
 
6 Attachment(s)
more pic's of my progress, did a dry fit test to ensure everything fits properly before finishing the fuse. the other pics show the finished fuselage. nest step is to sand and glass the fuse..

AD

#12 AeroDude Feb 08, 2007 08:08 PM

fuselage fully glassed, vertical tail installed, next step to install wings prior to covering, current weight is 19 oz.

AD

#13 kriptonic Feb 08, 2007 10:33 PM

where is the battery hatch?

Gene

#14 AeroDude Feb 09, 2007 07:58 PM

5 Attachment(s)
More pic's,

Kriptonic these pic's show the bays for the ESC, RX and battery.

more to follow..........

more sanding, glass the LE of the wings for strength and durability, apply covering and paint..

AD

#15 AeroDude Feb 11, 2007 08:04 PM

5 Attachment(s)
More done, more pic's, finished the canopy, working on the bay door...

AD