Espritmodel.com Heli Air
vincent123's blog
6 Attachment(s) FZ3 build: RTF !
Build Log / Posted by vincent123 / Mar 24, 2013 @ 04:00 PM / 1,006 Views / 5 Comments / Reply
This is one nice RTF !

You open the box, follow the manual, a bit of glue here and there, and after 16 weekends, of you go!
3 Attachment(s) FZ3 build: oracovering WIP
Build Log / Posted by vincent123 / Mar 10, 2013 @ 12:23 PM / 963 Views / 0 Comments / Reply
Work In Progress ..
Center piece still to be done.
4 Attachment(s) FZ3 build: winglets
Build Log / Posted by vincent123 / Mar 01, 2013 @ 04:10 AM / 1,536 Views / 5 Comments / Reply
Upside down winglets installed.

Control surfaces yet to be done.
3 Attachment(s) FZ3 build: fences
Build Log / Posted by vincent123 / Feb 24, 2013 @ 02:16 PM / 1,415 Views / 0 Comments / Reply
Fences ready, located at about 1/2 and 2/3 of half wing span.

First one aligned with flap/aileron split.

Fences higher compared to the 2 fences on the FZ3-PT, in order to be sure they have a functional fence effect.

Later some better pictures ...
6 Attachment(s) FZ3 build: fuselage finished
Build Log / Posted by vincent123 / Feb 17, 2013 @ 02:33 PM / 1,436 Views / 1 Comments / Reply
Hi there,

finished the fuselage today.

Motor and ESC locked in place, both catching a good deal of air for good cooling.

Next step will be the fences, the winglets, painting, ...

Vincent
FZ3 build: front wheel
Build Log / Posted by vincent123 / Feb 10, 2013 @ 07:08 AM / 1,668 Views / 0 Comments / Reply
Finally managed to make a video footage !

Flying wing with landing gear (0 min 23 sec)
3 Attachment(s) FZ3 build: front wheel
Build Log / Posted by vincent123 / Feb 09, 2013 @ 12:53 PM / 1,539 Views / 0 Comments / Reply
Today busy re-making the front gear door thingy.

Connected the 2 hinges for torsional stiffness.
6 Attachment(s) FZ3 build: fuselage
Build Log / Posted by vincent123 / Feb 04, 2013 @ 02:42 PM / 1,604 Views / 0 Comments / Reply
Fuselage with retract and motor mount fitted.

Still fiddling with the bay door, not yet satisfied ..., too fragile, need to make it more solid: it will be catching a deal of air..

Door servo not yet in place.
8 Attachment(s) FZ3 build: Flaps and Ailerons
Build Log / Posted by vincent123 / Jan 27, 2013 @ 02:46 PM / 1,479 Views / 0 Comments / Reply
The flaps and ailerons took longer than I thought.
The horns, which I made for the first time out of wood, in order to keep the top face of the wing clean, took a while !

All in all, pretty happy with the result.

The bottom gap/split is only 1mm, my best yet.
3 Attachment(s) FZ3 build: top and bottom view
Build Log / Posted by vincent123 / Jan 21, 2013 @ 12:11 PM / 1,562 Views / 0 Comments / Reply
Ready for the ailerons and flaps to cut out.

Plastic window for the battery alarm readout.

Reciever bind connector button can still be pressed
1 Attachment(s) FZ3 build: bye bye reciever
Build Log / Posted by vincent123 / Jan 19, 2013 @ 05:34 AM / 1,794 Views / 0 Comments / Reply
Topside sheeted.

Reciever and battery alarm put inside the wing.
1 Attachment(s) FZ3 build: sheeting
Build Log / Posted by vincent123 / Jan 06, 2013 @ 06:09 AM / 2,442 Views / 0 Comments / Reply
1 face sheeted, 3 to go!
2 Attachment(s) FZ3 build: steerable retract unit ready
Build Log / Posted by vincent123 / Jan 04, 2013 @ 03:08 AM / 2,076 Views / 0 Comments / Reply
Steerable retract unit, ready to be glued onto the center reinforced rib.
3 Attachment(s) FZ3 build: reinforced center rib
Build Log / Posted by vincent123 / Jan 01, 2013 @ 02:17 PM / 2,024 Views / 0 Comments / Reply
2mm center rib reinforced with 0,2mm ALU., total weight only 20 grams (10gr wood, 10gr ALU)
This rib acts as the spinal core for mounting the front retract and rear motor.

Hoping it's strong enough to withstand rough landings!
3 Attachment(s) FZ3 build
Build Log / Posted by vincent123 / Dec 29, 2012 @ 03:19 PM / 2,017 Views / 0 Comments / Reply
One wing-half ready for sheeting.

Wing will be sheeted with 1mm balsa and not glassed but covered with ORACOVER.
Why not glassing? Glassing would add about 120gr, instead of ORACOVER only 24gr. I somewhere underestimated the final weight of this foam construction method !?...
2 Attachment(s) FZ3 build
Build Log / Posted by vincent123 / Dec 25, 2012 @ 05:23 PM / 2,217 Views / 0 Comments / Reply
Webbing spar leading and trailing edges.
2 Attachment(s) FZ3 build
Build Log / Posted by vincent123 / Dec 16, 2012 @ 01:21 PM / 2,095 Views / 0 Comments / Reply
Wing spars glued
Wing cut in 3 pieces for webbing spars.
3 Attachment(s) Starting the FZ3 build
Build Log / Posted by vincent123 / Dec 11, 2012 @ 12:50 PM / 2,497 Views / 0 Comments / Reply
Cutting the foam wing out of home insulation material
1 Attachment(s) New hatch door design
Build Log / Posted by vincent123 / Nov 24, 2012 @ 12:07 PM / 2,231 Views / 0 Comments / Reply
Based on the Hobby king door hinges:
http://www.hobbyking.com/hobbyking/s...idProduct=8407
FZ3-PT: Flying wing with landing gear
Discussion / Posted by vincent123 / Nov 12, 2012 @ 02:19 PM / 2,227 Views / 0 Comments / Reply
Castle Creations      DRIVE / FLY / SUPPORT