Two fuselage sides, required connection at the center

DSC_7849.jpg - 100.9 KB - Views: 88
Posted by: ViperZ on Jan 31, 2012 08:52 PM
Two fuselage sides, required connection at the center
 
DSC_7846.jpg
Motor box construction
<<
DSC_7847.jpg
<
DSC_7849.jpg
*
DSC_7852.jpg
I used 30min epoxy and then put it under weight over night to insure it was flush
>
DSC_7854.jpg
Fuselage sides and bulk heads in place and glued up
>>

« Previous 5 Attachments | Next 5 Attachments »