nsg
Jul 15, 2009, 08:07 PM
I ordered five of IK6053007, gear step 1, back in January. Since then the availability date has been pushed back two weeks at a time. Responses to my questions wrt that sad comedy go from clueless to non-existent.
1. Could somebody from H-L (preferably Jason, I guess) comment on when that $20 piece of nylon will finally be available. This is somewhat of importance to me: that gear is easily stripped - I stripped a couple when I tried to fit a Medusa motor to my Viper 90, and I do need to get a better motor than what I have now.
2. Those of you thinking of buying an Eco 8Royal currently on crash sale - I won't touch an Ikarus product with a proverbial barge pole at that point. The availability and pricing of the spare parts is beyond absurd; my Viper required $100 worth of upgrades to be made flyable.
3. How are those availability dates set anyway? Does the new H-L website use a random number generator for that, or what?
Thanks in advance.
NS
(the H-L staff has had trouble locating that part on their website, so here's a direct link: http://www.hobby-lobby.com/viper_gear_step_1_5586_prd1.htm)
1. Could somebody from H-L (preferably Jason, I guess) comment on when that $20 piece of nylon will finally be available. This is somewhat of importance to me: that gear is easily stripped - I stripped a couple when I tried to fit a Medusa motor to my Viper 90, and I do need to get a better motor than what I have now.
2. Those of you thinking of buying an Eco 8Royal currently on crash sale - I won't touch an Ikarus product with a proverbial barge pole at that point. The availability and pricing of the spare parts is beyond absurd; my Viper required $100 worth of upgrades to be made flyable.
3. How are those availability dates set anyway? Does the new H-L website use a random number generator for that, or what?
Thanks in advance.
NS
(the H-L staff has had trouble locating that part on their website, so here's a direct link: http://www.hobby-lobby.com/viper_gear_step_1_5586_prd1.htm)